Projects
We are proud of the projects that we completed successfully with our customers. For this reason, we are pleased to show our focal points here with an excerpt of our current and completed projects:
BMW REGENSBURG - BODY FRAME/SIDE FRAME U11
Project: BODY FRAME/SIDE FRAME U11
Factory: BMW W6.12 REGENSBURG
Division: BODY-IN-WHITE
Time frame: 05/2024 – 12/2025
Key data:
-
12 cells
-
12 PLC‘s (Siemens CPU 1518F)
- 120 robots (KUKA KRC4)
-
application: spot welding, laser welding, glueing, clinching, material handling
-
cycle time: 165s
Field of responsibility:
- project managment and on-site management
-
hardware construction
-
software design and HMI programming
-
OLP robot programming
-
control cabinet construction
-
on-site electrical installation
-
on-site commissioning
- training of operating and maintenance staff
Plastic Omnium RAMOS MEXICO - RETROFIT BMM501
Project: RETROFIT BMM501
Factory: PLASTIC OMNIUM RAMOS MEXICO
Division: Special Systems Engineering
Time frame: 08/2024 – 07/2025
Key data:
-
1 cell
-
Retrofit electrics: replacement of the entire electrical technology including control,
HMI, control cabinets, servo technology including new cabling -
Retrofit mechanics: Renewal of critical mechanics including replacement of blowing
stand, hydraulics, servo motors, sensors and actuators - Integration new robot incl. EOA-tool
Field of responsibility:
- project managment and on-site management
-
engineering and construction (mechanical and electrical)
-
manufacturing and assembly (mechanical and electrical)
-
software design and HMI programming
-
on-site installation and commissioning
-
training of operating and maintenance staff
-
Documentation
BMW DINGOLFING - TAILGATE/FRONTLID G50, VB/HB G60LCI
Project: TAILGATE/FRONTLID G50, VB/HB G60LCI
Factory: BMW W2.4 DINGOLFING
Division: BODY-IN-WHITE
Time frame: 03/2024 – 08/2026
Key data:
-
9 cells
-
9 PLC´s (Siemens CPU 1518F)
- 84 robots (KUKA KRC4)
-
application: spot welding, laser welding, glueing, clinching, material handling
-
cycle time: 120s
Field of responsibility:
- project managment and on-site management
-
hardware construction
-
software design and HMI programming
-
OLP robot programming
-
control cabinet construction
-
on-site electrical installation
-
on-site commissioning
- training of operating and maintenance staff
Plastic Omnium VIGO - RETROFIT EXTR. B-F
Project: RETROFIT EXTR. B-F
Factory: PLASTIC OMNIUM VIGO
Division: Special Systems Engineering
Time frame: 12/2023 – 09/2024
Key data:
-
1 cell
-
Retrofit electrical system: replacement of the complete servo technology including
upgrade control technology -
Retrofit mechanics: renewal of critical components (sensors and actuators)
Field of responsibility:
- project managment and on-site management
-
engineering and construction (mechanical and electrical)
-
manufacturing and assembly (mechanical and electrical)
-
software design and HMI programming
-
on-site installation and commissioning
-
training of operating and maintenance staff
-
Documentation
ANTB PUNE INDIA - LASER WELDING SYSTEM PCL5
Project: LASER WELDING SYSTEM PCL5
Factory: ANTB PUNE INDIA
Division: LASER WELDING
Time frame: 02/2024 – 12/2024
Key data:
-
1 welding system
-
1 PLC (Siemens CPU 1517TF)
-
12 servoaxis Siemens Sinamcis
-
application: laser welding
- welding speed: 18m/min
Field of responsibility:
- project managment and on-site management
-
software design
-
HMI programming
-
on-site commissioning
-
training of operating and maintenance staff
Plastic Omnium ADRIAN - RETROFIT BMM305
Project: RETROFIT BMM305
Factory: Plastic Omnium Adrian
Division: Special Systems Engineering
Time frame: 01/2024 – 12/2024
Key data:
-
1 cell
-
Retrofit electrics: replacement of the entire electrical technology including control,
HMI, control cabinets, servo technology including new cabling -
Retrofit mechanics: Renewal of critical mechanics including replacement of blowing
stand, hydraulics, servo motors, sensors and actuators
Field of responsibility:
- project managment and on-site management
-
engineering and construction (mechanical and electrical)
-
manufacturing and assembly (mechanical and electrical)
-
software design and HMI programming
-
on-site installation and commissioning
-
training of operating and maintenance staff
-
Documentation
ANTB AHMEDABAD INDIA - LASER WELDING SYSTEM PCL4
Project: LASER WELDING SYSTEM PCL4
Factory: ANTB AHMEDABAD INDIA
Division: LASER WELDING
Time frame: 01/2024 – 09/2024
Key data:
-
1 welding system
-
1 PLC (Siemens CPU 1517TF)
-
12 servoaxis Siemens Sinamcis
-
application: laser welding
- welding speed: 18m/min
Field of responsibility:
- project managment and on-site management
-
software design
-
HMI programming
-
on-site commissioning
-
training of operating and maintenance staff
Plastic Omnium Lozorno - RETROFIT AUDI ASSEMLBLY LINE
Project: Retrofit AUDI Assembly line
Factory: Plastic Omnium Lozorno
Division: Special Systems Engineering
Time frame: 10/2023 – 10/2024
Key data:
-
1 cell
-
1 PLC (Siemens CPU 317F), 1 Robot (ABB)
-
application: robot handling, store management
-
Retrofit, conveyor technology, data management, robotic
Field of responsibility:
- project managment and on-site management
-
engineering and construction (mechanical and electrical)
-
manufacturing and assembly (mechanical and electrical)
-
software design and HMI programming
-
on-site installation and commissioning
-
training of operating and maintenance staff
-
Documentation
Audi Ingolstadt - DOOR SEALER LINE ML1 NEW
Project: Door sealer line ML1 NEW
Factory: AUDI Ingolstadt
Division: Assembly
Time frame: 08/2023 – 10/2024
Key data:
-
6 cells
-
5 PLC‘s (Siemens CPU 1517F)
-
application: material handling, sealer application
-
cycle time: 85s
Field of responsibility:
- project managment and on-site management
-
hardware construction
-
software design and HMI programming
-
on-site electrical installation
- on-site commissioning
- on-site robot programming
-
training of operating and maintenance staff
Audi Ingolstadt - Integration AU493 ML2
Project: Integration AU493 ML2
Factory: AUDI Ingolstadt
Division: Assembly
Time frame: 09/2023 – 05/2024
Key data:
-
1 cells
-
5 PLC‘s (Siemens CPU 1517F, 1512F)
-
application: material handling, sealer application
-
cycle time: 85s
Field of responsibility:
- project managment and on-site management
-
hardware construction
-
software design and HMI programming
-
on-site electrical installation
- on-site commissioning
- on-site robot programming
-
training of operating and maintenance staff
BMW USA - Controls Door Sealer
Project: Controls Door Sealer
Factory: BMW W10 Spartanburg, USA
Division: Assembly
Time frame: 05/2023 – 08/2024
Key data:
-
1 cells
-
5 PLC‘s (Siemens CPU 319F)
-
application: material handling, sealer application
-
cycle time: 85s
Field of responsibility:
-
software coordination - TMO-V3 standard
-
PLC programming and debugging
- on-site robot programming
- on-site commissioning
-
optimization und stabilization of production
HYUNDAI KOREA - UPGRADe HCL-U
Project: Upgrade HCL-U
Factory: HYUNDAI Ulsan South Korea
Division: Laser Welding
Time frame: 02/2023 – 04/2024
Key data:
-
1 welding system
- 1 PLC (Siemens CPU 416)
-
5 robots (ABB IRC5)
-
12 servoaxis SEW MoviAxis
-
application: laser welding, material handling
-
welding speed: 18m/min
Field of responsibility:
- project managment and on-site management
-
hardware construction
-
software design
-
HMI programming
-
offline robot programming
- on-site commissioning
- on-site robot programming
-
training of operating and maintenance staff
Audi Ingolstadt -Integration AU51x ML1
Project: Integration AU51X ML1
Factory: AUDI Ingolstadt
Division: Assembly
Time frame: 07/2023 – 08/2024
Key data:
-
1 cells
-
5 PLC‘s (Siemens CPU 1517F, 1512F)
-
application: material handling, sealer application
-
cycle time: 85s
Field of responsibility:
- project managment and on-site management
-
hardware construction
-
software design and HMI programming
-
on-site electrical installation
- on-site commissioning
- on-site robot programming
-
training of operating and maintenance staff
HYUNDAI KOREA - Laser welding system HCL-K7
Project: Laser Welding System HCL-K7
Factory: Hyundai Yesan South Korea
Division: Laser Welding
Time frame: 05/2023 – 04/2024
Key data:
-
1 welding system
-
1 PLC (Siemens CPU 1517TF)
-
4 robots (ABB IRC5)
-
12 servoaxis Siemens Sinamics S120
-
application: laser welding, material handling
-
welding speed: 18m/min
Field of responsibility:
- project managment and on-site management
-
software design
-
HMI programming
- offline robot programming
-
on-site commissioning
-
training of operating and maintenance staff
Plastic Omnium Rottenburg - Retrofit Aging cell Porsche
Project: Retrofit Aging cell Porsche BMM3
Factory: Plastic Omnium Rottenburg
Division: Special Systems Engineering
Time frame: 05/2023 – 12/2023
Key data:
-
1 cell
-
1 PLC (Siemens CPU 317F), 1 Robot (ABB)
-
application: robot handling, store management
-
Retrofit, conveyor technology, data management, robotic
Field of responsibility:
- project managment and on-site management
-
engineering and construction (mechanical and electrical)
-
manufacturing and assembly (mechanical and electrical)
-
software design and HMI programming
-
on-site installation and commissioning
-
training of operating and maintenance staff
-
Documentation
Magna Elsendorf - Door System G26.2
Project: Door System G26.2
Factory: Magna, Elsendorf
Division: Body-in-white
Time frame: 08/2022 – 12/2023
Key data:
- 4 cells
- 4 PLC‘s (Siemens CPU 4x416F)
- application: material handling, glueing, spot welding, laser welding, clinching, roller hemming
- cycle time: 65s
Field of responsibility:
- project managment and on-site management
- hardware construction (app. 2400 pages)
- software design and HMI programming
- control cabinet construction (4 control cabinets, 10 terminal boxes, 20 HMI panels)
- electrical installation in Elsendorf
- commissioning in Elsendorf
- robot programming (offline, online) in Elsendorf
- training of operating and maintenance staff
Plastic omnium Rottenburg - Retrofit Aging cell Porsche
Project: Retrofit Aging cell Porsche
Factory: plastic Omnium Rottenburg
Division: Special Systems Engineering
Time frame: 09/2022 – 12/2022
Key data:
-
1 cell
-
1 PLC (Siemens CPU 317F), 1 Robot (ABB)
-
application: robot handling, store management
-
Retrofit, conveyor technology, data management, robotic
Field of responsibility:
- project managment and on-site management
- engineering and construction (mechanical and electrical)
- manufacturing and assembly (mechanical and electrical)
- software design and HMI programming
- on-site installation and commissioning
- training of operating and maintenance staff
- Documentation
Plastic omnium Rottenburg - Upgrade Assembly line Porsche
Project: Upgrade Assembly line Porsche
Factory: plastic Omnium Rottenburg
Division: Special Systems Engineering
Time frame: 03/2022 – 12/2022
Key data:
-
1 cell
-
1 PLC (Siemens CPU 315)
-
8 robots (ABB IRC5)
-
application: Assembly line
-
Retrofit, Conveyor technology, rotary units, barcode scanning, data management
Field of responsibility:
- project managment and on-site management
- engineering and construction (mechanical and electrical)
- manufacturing and assembly (mechanical and electrical)
- software design and HMI programming
- on-site installation and commissioning
- training of operating and maintenance staff
- Documentation
HYUNDAI korea - Laser welding system HCL-K5/HCL-K6
Project: Laser welding system HCL-K5/HCL-K6
Factory: Hyundai Yesan south korea
Division: Laser Welding
Time frame: 07/2022 – 12/2023
Key data:
- 2 welding system
-
2 PLC (Siemens CPU 1517TF)
-
8 robots (ABB IRC5)
-
24 servoaxis SEW MoviAxis
-
application: laser welding, material handling
-
welding speed: 18m/min
Field of responsibility:
-
project managment and on-site management
-
software design
-
HMI programming
-
offline robot programming
-
on-site commissioning
-
on-site robot programming
-
training of operating and maintenance staff
AMTB Senica - Laser welding system LSC6
Project: Laser welding system LSC6
Factory: AMTB SENICA Slovakia
Division: Laser Welding
Time frame: 06/2022 – 07/2023
Key data:
- 1 welding system
- 1 PLC (Siemens CPU 1517F)
- 4 robots (ABB IRC5)
- 12 servoaxis SEW MoviAxis
- application: laser welding, material handling
- welding speed: 18m/min
Field of responsibility:
- project managment and on-site management
- software design
- HMI programming
- offline robot programming
- on-site commissioning
- on-site robot programming
- training of operating and maintenance staff
ANTB Pune - Laser welding system PCL3
Project: Laser welding system PCL3
Factory: ANTB PUNE India
Division: Laser Welding
Time frame: 05/2022 – 05/2023
Key data:
-
1 welding system
-
1 PLC (Siemens CPU 319F)
- 12 servoaxis SEW MoviAxis
- application: laser welding
-
welding speed: 18m/min
Field of responsibility:
- project management and on-site management
- software design
- HMI programming
-
on-site commissioning
-
training of operating and maintenance staff
Skoda Bratislava - door sealing application SK49X
Project: door sealing application SK49X
Factory: VW Bratislava Slovakia
Division: assembly
Time frame: 01/2022 – 02/2023
Key data:
- 1 cell
- 1 PLC (Siemens CPU 1517F)
- application: material handling, glueing
-
cycle time: 60s
Field of responsibility:
- project management and on site management
-
hardware construction (app. 950 pages)
- software design and HMI programming
-
control cabinet construction (2 control cabinets, 9 terminal boxes, 5 HMI panels)
-
electrical installation in Germany, tear down and relocation to Bratislava
-
commissioning in Germany and in Bratislava
-
training of operating and maintenance staff
Magna Albersdorf - INTEGRATION DOORS GMOPF/FISKER
Project: INTEGRATION DOORS GMOPF/FISKER
Factory: Magna Albersdorf Austria
Division: Body-in-white
Time frame: 08/2021 – 23/2023
Key data:
- 5 cells
-
8 PLC‘s (Siemens CPU 416F)
- application: material handling, glueing, spot welding, laser welding, clinching, roller hemming, tucker
-
cycle time: 277s (GMOPF), 75s (FISKER)
Field of responsibility:
- project management and on site management
- hardware construction (app. 3500 pages)
- software design and HMI programming
- control cabinet construction (6 control cabinets, 20 terminal boxes, 9 HMI panels)
- electrical installation in Albersdorf
- commissioning in Albersdorf
- robot programming (offline, online) in Albersdorf
- training of operating and maintenance staff
HÖFTER - UPGRADE PALLETIZER
Project: Upgrade palletizer
Factory: HÖFTER Neuhausen
Division: Special systems engineering
Time frame: 08/2021 - 12/2021
Key data:
- 1 cell
- 1 PLC (Siemens CPU 1215C)
- application: palletizer
- conveyor technology, rotary units, palletizing
Field of responsibility:
- project management and on site management
- engineering and construction (mechanical and electrical)
- manufacturing and assembly (mechanical and electrical)
- software design and HMI programming
- on site installation and commissioning
- training of operating and maintenance staff
- documentation
RIKUTEC - PRESSURE DIFFERENCE TESTING SYSTEM
Project: Pressure differnce testing system DPV1500L
Factory: RIKUTEC Altenkirchen
Division: Special systems engineering
Time frame: 04/2021 - 07/2021
Key data:
- 1 cell
- 1 PLC (Siemens CPU 1215C)
- application: pressure difference testing system
- test pressure: max. 333 mbar
- leakage rate: 0.4 mm diameter
- inline measurement with "warm" containers (max. 1500l)
Field of responsibility:
- project project management and on site management
- engineering and construction (mechanical and electrical)
- manufacturing and assembly (mechanical and electrical)
- software design and HMI programming
- on site installation and commissioning
- training of operating and maintenance staff
- documentation including CE
Audi Ingolstadt - Robot Sealer-Application A11/A13
Project: Robot Sealer-Application A11/A13
Factory: Audi Neckarsulm
Division: Assembly
Time frame: 07/2021 - 06/2023
Key data:
- 2 cells
- 10 PLC (Siemens CPU 1517F, 15127F)
- application: material handling, sealer application
- cycle time: 85s
Field of responsibility:
- project managment and on-site management
- hardware construction (app. 2.000 pages)
- software design and HMI programming
- control cabinet construction (8 control cabinets, 16 terminal boxes, 8 HMI panels)
- on-site electrical installation
- on-site commissioning
- on-site robot programming
- training of operating and maintenance staff
BMW Dingolfing - HEAT 2
Project: HEAT 2
Factory: BMW plant 2.1/2.2 Dingolfing
Division: Battery
Time frame: 05/2021- 02/2022
Key data:
- 25 cells
- 20 PLC‘s (Siemens CPU 1518F)
- applications : thermal joining , screwing , pressing , end of line check
- cycle time: 53s
Field of responsibility:
- software coordination ensuring, reworking and monitoring of TMO V3 standard
- PLC programming and debugging
- on site electrical installation
- on site commissioning
- training of operating and maintenance staff
VW Emden - Door Sealing Application VW316/VW416
Project: Door Sealing Application VW316/VW416
Factory: VW Emden
Division: Assembly
Time frame: 02/2021 - 05/2022
Key data:
- 8 cells
- 5 PLC (Siemens CPU 1517F)
- 10 robots (KUKA VKRC4)
- application : material handling , sealer application
- cycle time: 60s
Field of responsibility:
- project managment and on site management
- hardware construction app. 1.200 pages
- software design and HMI programming
- control cabinet construction (3 control cabinets , 10 terminal boxes , 8 HMI panels)
- on site electrical installation
- on site commissioning
- training of operating and maintenance staff
BMW Dingolfing - HEAT
Project: HEAT (basic and end engine)
Factory: BMW plant 2.2 Dingolfing
Division: Battery
Time frame: 03/2020 06/2021
Key data:
- 30 cells
- 11 PLC (Siemens CPU 1518F)
- 20 robots (KUKA KRC4)
- applications : thermal joining , screwing , pressing , end of line check
- cycle time: 49s
Field of responsibility:
- software coordination ensuring, reworking and monitoring of TMO V3 standard
- takeover project from another supplier (failed commissioning)
- online robot programming
- PLC programming and debugging
- on site electrical installation
- on site commissioning
- training of operating and maintenance staff
Audi Ingolstadt - Robot Sealer-Application ML1
Project: Robot Sealer-Application ML1
Factory: Audi Ingolstadt
Division: Assembly
Time frame: 07/2020 - 07/2021
Key data:
- 1 cell
- 1 PLC (Siemens CPU 1517F)
- application: material handling, sealer application
- cycle time: 60s
Field of responsibility:
- project managment and on-site management
- hardware construction (app. 600 pages)
- software design and HMI programming
- control cabinet construction (3 control cabinets, 4 terminal boxes, 4 HMI panels)
- on-site electrical installation
- on-site commissioning
- on-site robot programming
- training of operating and maintenance staff
Magna Elsendorf - Tailgate U11
Project: Tailgate U11
Factory: Magna; Elsendorf
Division: Body-In-White
Time frame: 06/2020 - 08/2021
Key data:
- 3 cells
- 3 PLC's (Siemens CPU 4x416F)
- application: material handling, glueing, spot welding, laser welding, clinching, roller hemming
- cycle time: 75s
Field of responsibility:
- project managment and on-site management
- hardware construction (app. 1800 pages)
- software design and HMI programming
- control cabinet construction (3 control cabinets, 6 terminal boxes, 9 HMI panels)
- electrical installation in Elsendorf
- commissioning in Elsendorf
- robot programming (offline, online) in Elsendorf
- training of operating and maintenance staff
Baosteel Hangzhou - Laser Welding System LSC14
Project: Laser Welding System LSC14
Factory: Baosteel Hangzhou
Division: Laser Welding
Time frame: 10/2019 - 12/2021
Key data:
- 1 welding system
- 1 PLC (Siemens CPU 1517TF-3)
- 5 robots (ABB IRC5)
- 18 servoaxis Sinamics S120
- application: laser welding, material handling
- welding speed: 18m/min
Field of responsibility:
- project managment and on-site management
- software design
- HMI programming
- offline robot programming
- on-site commissioning
- on-site robot programming
- training of operating and maintenance staff
VW Pacheco - Door Sealing Application VW316
Project: Door Sealing Application VW316
Factory: VW; Pacheco Argentina
Division: Assembly
Time frame: 09/2019 - 07/2021
Key data:
- 1 cell
- 1 PLC (Siemens CPU 1515F)
- applications: material handling, glueing
- cycle time: 60s
Field of responsibility:
- project managment and on-site management
- hardware construction (app. 1100 pages)
- software design and HMI programming
- control cabinet construction (2 control cabinets, 11 terminal boxes, 5 HMI panels)
- electrical installation in Germany, tear down and relocation to Argentina
- commissioning in Germany and in Argentina
- training of operating and maintenance staff
MAGNA Elsendorf - Door System G26
Project: Door System G26
Factory: MAGNA; Elsendorf
Division: Body-In-White
Time frame: 08/2019 - 03/2021
Key data:
- 4 cells
- 4 PLC's (Siemens CPU 4x416F)
- applications: material handling, glueing, spot welding, laser welding, clinching, roller hemming
- cycle time: 65s
Field of responsibility:
- project managment and on-site management
- hardware construction (app. 2400 pages)
- software design and HMI programming
- control cabinet construction (4 control cabinets, 10 terminal boxes, 20 HMI panels)
- electrical installation in Elsendorf
- commissioning in Elsendorf
- robot programming (offline, online) in Elsendorf
- training of operating and maintenance staff
ANTB Pune - Laser Welding System PCL2
Project: Laser Welding System PCL2
Factory: ANTB Pune; India
Division: Laser Welding
Time frame: 08/2019 - 12/2019
Key data:
- 1 welding system
- 1 PLC (Siemens CPU 319F-3)
- applications: laser welding
- welding speed: 12m/min
Field of responsibility:
- software design and HMI programming
- commissioning in Germany and in India
Daimler East London - Door Sealing Application W205, W206
Project: Door Sealing Application W205, W206
Factory: Daimler; East London
Division: Assembly
Time frame: 07/2019 - 12/2021
Key data:
- 2 cells
- 3 PLC's (Siemens CPU 1517F)
- applications: material handling, glueing
- cycle time: 120s
Field of responsibility:
- project managment and on-site management
- hardware construction (app. 400 pages)
- software design and HMI programming
- control cabinet construction (2 control cabinets, 1 terminal box)
- electrical installation in Germany, tear down and relocation to South Africa
- commissioning in Germany and in South Africa
- training of operating and maintenance staff
VW Qingdao - Door Sealing Application AU38X
Project: Door Sealing Application AU38X
Factory: VW Qingdao
Division: Assembly
Time frame: 10/2018 – 07/2021
Key data:
- 1 cell
- 1 PLC (Siemens CPU 319)
- applications: material handling, glueing
- cycle time: 60s
Field of responsibility:
- project managment and on-site management
- hardware construction (app. 1100 pages)
- software design and HMI programming
- control cabinet construction (2 control cabinets, 11 terminal boxes, 5 HMI panels)
- electrical installation in Germany, tear down and relocation to China
- commissioning in Germany and in China
- training of operating and maintenance staff
Audi Ingolstadt - Robot Sealer - Application ML2/3
Project: Robot Sealer-Application ML2/3
Factory: Audi Ingolstadt
Division: Assembly
Time frame: 08/2018 – 10/2019
Key data:
- 2 cells
- 2 PLC's (Siemens CPU 1517F)
- applications: material handling, sealer application
- cycle time: 60s
Field of responsibility:
- project managment and on-site management
- hardware construction (app. 800 pages)
- software design and HMI programming
- control cabinet construction (4 control cabinets, 8 terminal boxes, 8 HMI panels)
- on-site electrical installation
- on-site commissioning
- on-site robot programming
- training of operating and maintenance staff
BMW W2.4 DINGOLFING - PREFORMING IHU G82
Project: Preforming IHU G82
Factory: BMW W2.4 Dingolfing
Division: Press shop
Time frame: 08/2018 – 12/2018
Key data:
- 1 cell
- 1 PLC (Siemens CPU 1518F)
- 3 robots (KRC4)
- applications: docking, marking, material handling
- cycle time: 60s
Field of responsibility:
- project managment and on-site management
- hardware construction (app. 3000 pages)
- software design and HMI programming
- online robot programming
- control cabinet construction (5 feed-in cabinets, 15 terminal boxes, 25 HMI panels)
- on-site electrical installation
- on-site commissioning
- training of operating and maintenance staff
BMW W2.4 DINGOLFING - REAR BODY G22/G23
Project: Rear Body G22/G23
Factory: BMW W2.4 Dingolfing
Division: Body-In-White
Time frame: 08/2018 – 12/2019
Key data:
- 9 cells
- 9 PLC‘s (Siemens CPU 1518F)
- 108 robots (KUKA KRC2, KRC4)
- applications: spot welding, glueing, clinching, material handling
- cycle time: 85s
Field of responsibility:
- project managment and on-site management
- online robot programming
- control cabinet construction
- on-site electrical installation
- on-site commissioning
- training of operating and maintenance staff
WISCO OLOFSTRÖM - ABLATION LINE AAS
Project: Ablation Line AAS
Factory: WISCO Olofström, Sweden
Division: Laser welding
Time frame: 11/2017 – 03/2018
Key data:
- 1 cell
- 1 PLC (Siemens CPU 315F)
- 2 robot (ABB IRC5)
- applications: material handling and laser welding
- cycle time: 12s
Field of responsibility:
- project managment and on-site management
- software design
- HMI programming
- offline robot programming
- on-site commissioning
- on-site robot programming
- training of operating and maintenance staff
BMW Leipzig - Hood / Finish F40
Project: Hood / Finish F40
Factory: BMW Leipzig
Division: Body-In-White
Time frame: 08/2017 – 12/2018
Key data:
- 5 cells
- 5 PLC (Siemens CPU 1518F)
- 25 robots (FANUC RJ2000i)
- Applications: glueing, clinching, roller hemming, material handling
- Cycle time: 120s
Field of responsibility:
- Project management and building site management
- Hardware construction (approx. 3000 pages)
- Software design and HMI programming
- Online robot programming
- Control cabinet construction (5 feed-in cabinets, 15 terminal boxes, 25 HMI panels)
- On-site electrical installation
- On-site commissioning
- Training operators and maintenance staff
BMW Regensburg - Integration F40 Rear Compartment
Project: Integration F40 Rear Compartment
Factory: BMW Regensburg
Division: Body-In-White
Time frame: 09/2017 – 08/2018
Key data:
- 19 cells
- 19 PLC (Siemens CPU 416F)
- 65 robots (ABB IRC5, KUKA KRC2)
- Applications: spot welding, stud welding, glueing, material handling
- Cycle time: 57s
Field of responsibility:
- Project management and building site management
- Hardware construction (approx. 4500 pages)
- Software design and HMI programming
- Online robot programming
- On-site electrical installation
- On-site commissioning
- Training operators and maintenance staff
C-CON Eitensheim - Hood CFK M4CS
Project: Hood CFK M4CS
Factory: C-CON Eitensheim
Division: Body-In-White
Time frame: 03/2017 – 10/2017
Key data:
- 2 cells
- 2 PLC (Siemens CPU 1513F)
- Applications: laser processing, glueing, material handling
- Cycle time: 142s
Field of responsibility:
- Project management and building site management
- Hardware construction (approx. 500 pages)
- Development of a software standard
- Software design and HMI programming
- On-site electrical installation
- On-site commissioning
BMW Regensburg - Speed Up 50+ / 54+
Project: Speed Up 50+ / 54+
Factory: BMW Regensburg
Division: Body-In-White
Time frame: 03/2017 – 10/2017
Key data:
- 8 cells
- 8 PLC (Siemens CPU 416F)
- Applications: spot welding, stud welding, glueing, material handling
- Cycle time: 62s
Field of responsibility:
- Project management and building site management
- Hardware construction (approx. 2500 pages)
- Software design and HMI programming
- On-site electrical installation
- On-site commissioning
- Training operators and maintenance staff
VW Mexico - Door Sealing Application VW371
Project: Door Sealing Application VW371
Factory: VW Puebla, Mexico
Division: Assembly
Time frame: 09/2016 – 07/2017
Key data:
- 1 cell
- 1 PLC (Siemens CPU 319F)
- Applications: material handling, glueing
- Cycle time: 60s
Field of responsibility:
- Project management and building site management
- Hardware construction (approx. 800 pages)
- Software design and HMI programming
- Cabinet manufacturing (2 control cabinets, 8 terminal boxes, 5 HMI panels)
- Electrical installation in Germany, tear down and relocation to Mexico
- Commissioning in Germany and Mexico
- Training operators and maintenance staff
Tata Steel - Laser Welding Line TCL1
Project: Laser Welding Line TCL1
Factory: Tata Steel Wolverhampton, Great Britain
Division: Laser welding
Time frame: 03/2016 – 12/2016
Key data:
- 1 PLC (Siemens CPU 319F)
- 25 servo-drives (SEW MoviPLC; SEW MoviAxis)
- 8 robots (ABB IRC5)
- Applications: laser welding, material handling
- Cycle time: 11s
Field of responsibility:
- Project management and building site management
- Hardware construction (approx. 600 pages)
- Software design and construction and HMI programming
- Cabinet manufacturing (2 feed-in cabinets, 2 servo-cabinets, 4 terminal boxes)
- On-site electrical installation
- Robot programming online
- On-site commissioning
- Training operators and maintenance staff
MagnaDrive Spartanburg - Roof and Liftgate G01
Project: Roof and Liftgate G01
Factory: MagnaDrive Spartanburg, USA
Division: Body-In-White
Time frame: 10/2015 – 12/2016
Key data:
- 3 cells
- 3 PLC‘s (Siemens CPU 1518F)
-
24 robots (KUKA KRC4)
- Applications: Laser, bolt and spot welding, glueing, roller hemming, clinching, material handling
- Cycle time: 125s
Field of responsibility:
- Project management and building site management
- Hardware construction (approx. 2100 pages)
- Software design and construction and HMI programming
- Cabinet manufacturing (3 control cabinets, 3 feed-in cabinets, 9 HMI panels)
- On-site electrical installation
- Robot programming offline and online
- On-site commissioning
- Training operators and maintenance
OPEL Saragossa - Liftgate P1Mx
Project: Liftgate P1Mx
Factory: OPEL Saragossa, Spain
Division: Body in white
Time frame: 05/2015 – 09/2016
Key data:
- 3 cells
- 3 PLC‘s (Rockwell GuardLogix 1756-L73S)
- Application: Laser, spot and stud welding, glueing, clinching, handling
- Cycle time: 85s
Field of responsibility:
- Project management and building site management
- Hardware construction (approx. 3000 pages)
- Software design and HMI programming
- Robot programming
- On-site electrical installation
- On-site commissioning
- Training for maintenance
Audi Factory San José Chiapa - Door Seal Application Q5
Project: Door Seal Application Q5
Factory: Audi San José Chiapa, Mexico
Division: Assembly
Time frame: 10/2014 – 09/2015
Key data:
- 1 cell
- 1 PLC‘s (Siemens CPU 319F)
- Application: Handling, glueing
- Cycle time: 60s
Field of responsibility:
- Project management and building site management
- Hardware construction (approx. 900 pages)
- Software design and HMI programming
- Control cabinet construction (2 control cabinets, 4 terminal boxes, 5 control consoles)
- Electrical installation in Lockweiler, relocation and reinstallation in Mexico
- Commissioning in Lockweiler, relocation and recommissioning in Mexico
- Training for maintenance
Hysco Yancheng, Hysco Tianjin - Laser Welding System HCL-C2, C3, C4
Project: Laser Welding SystemHCL-C2, C3, C4
Factory: Hysco Yancheng, Hysco Tianjin, China
Division: Laser welding
Time frame: 03/2012 – 05/2013
Key data:
- 3 cells
- 3 PLC‘s (Siemens CPU 319F)
- 15 robots (ABB IRC5)
- Applications: Laser welding, handling
- Cycle time: 14s
Field of responsibility:
- Project management and building site management
- Hardware construction (approx. 900 pages)
- Software design and HMI programming
- Online robot programming
- Control cabinet construction (3 control cabinets, 9 terminal boxes, 3 control consoles)
- Electrical installation in Ravensburg, relocation to China and reinstallation
- Commissioning in Ravensburg, relocation to China and recommissioning
- Training for maintenance